CASE STUDIES KIKEH SPAR Our clients trusted us to deliver the detail design for the 1.4 billion dollar DTU KIKEH SPAR HULL in a very tight schedule . The fate of SPAR was dependent on SD to deliver accurate cutting data, production drawings on time. Project Name: Murphy KIKEH DTU SPAR MURPHY SPAR Overview: Water Depth : 1330 mts Weight : 12000 Mt ; Length 142 mts ; Diameter : 32 mts; Landmark : First deep offshore development in Malaysia. First Spar to be installed outside Gulf of Mexico. SD is the first company in ASIA to successfully execute the detail design project for a SPAR. Scope of work : 3D Modeling, Generate Production drawings, NC Code, Nesting drawings, Weld Logs, Part list, Profile list, WCOG & Profile sketches, for.. 6 Hard Tanks, Deck Leg Supports, Chain Jack Foundations, Fairlead Foundation, Hard Tank truss Connections ,FTL Porches, TTR Guide, TTR Frames Location of Work: Malaysia Marine Heavy Engineering (Malaysia, Johor Bahru), Silicon Designs (India Bangalore, Technip (Finland).
Highlights 35000 man hour project - On time delivery. Accurate cutting data supplied, which is a key in these projects. Any fault in cutting data would delay the project by 3 months. First time ever a global delivery model was tried out saving significant costs to our client with world class quality. Three teams working across the globe on design / detail design (SD in India, MMHE in Malaysia and Technip in Finland), to make this project as success The on-time completion of SPAR is a testimony of our success. Challenges No time to understand the yard specific Tribon standards Unavailability of specialized Tribon codes No set up time given Frequent last minute changes in class drawings New requirements given at the later stages of modeling Work culture differences How we overcame those challenges Our Tribon practice head traveled onsite to understand yard standards and train the modelers back in India SD developed its own database of cutouts, end connections, brackets codes for Tribon Our engineers set up the entire project in a matter of 6 hours SD made changes and got the multi site review done with Technip – Finland, MMHE- Malaysia and SD - Bangalore. SD engineers were quick to adopt the new changes and release the drawings accurately SD engineers undergo soft skills training to work effectively with different work cultures and geographic locations
Copyright © 2007 Silicon Designs. All Rights Reserved